Integration activities of AsiaSat 9’s communication panels were under way. 114 kg of spacecraft wiring were secured to the panels. Unit installations are ongoing with electrical testing conducted to verify the health of the integrated units.
2015年07月28日
# 2 AsiaSat 9 Subsystems Integration Making Good Progress